What’s the status of the 710 Freeway tunnel?

(from Metro website)

Metro and Caltrans will release and circulate the Study’s draft environmental document in February 2015. Caltrans review and comment period is 90-days, and will hold two public hearings. The public is encouraged to provide comments during this period, and will have several options to submit comments:

  • In person at the public hearings
  • By U.S. Mail
  • Online through the Caltrans public comment website
Advertisement
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s